E-mail: Password:
 

Inside Plumbing Systems & Design
Mar Apr 2007

Click on the title to download a PDF of the article. If you do not already have Adobe Acrobat Reader, you can download it at www.adobe.com.

PSD Magazine Full Issue
Front Cover & Table of Contents

 

To Download a section without opening it in your browser, Right Click and select Save Target as or Save Link As.

 


  • Variable Speed Versus Constant Speed
    David Carrier and Ryan B. Stickney
    In this two-part article, the authors explain why and how variable-speed pressure control technology may be very cost-effective in some plumbing system applications. Part 1 delves into the technology behind variable-speed systems, and Part 2 provides a path to quantifying energy savings for clients.
  • Case Study-The Challenges of Green Building CORTEX One: Half-empty or Half-full? A Lesson in Water Conservation
    Paul Todd Merrill, PE, LEED AP, and
    Steve Niehoff, CID, CIC, CLIA

    By now, the idea of green building and its environmental advantages are well-known. But how many plumbing engineers have actually designed the plumbing systems for an entire building to earn LEED certification? The cover story authors did just that, and in this article, they explain what they discovered in the process.
  • Dispute Resolution 101 for Plumbing Engineers
    Steven Nudelman
    In our litigious era, surely there must be a better way to resolve business disputes than going to court? Luckily, there is, and in this article, our legal expert explains some of the most popular methods of dispute resolution.

Getting Technical


ASPE Report

  • ASPE Report
    From the President’s Pen
    From the Executive’s Desk
    ASPE Standards Committee Update
    Highlights of the January 2007 ASPE Board of Directors Meeting
    New ASPE Members

Perspectives